Wednesday, July 17, 2013

Vibrating beam mixing synthetic turf


Vibrating beam mixing synthetic turf

  Fully vibrated concrete mixture, and then vibrating beam further synthetic turf drag and initially the entire dry tap. Vibrating beam and from 2 to 3 times drag, so that the surface pan pulp and out of the bubbles. Move it slow vibrating beam uniformity, and not half-way stop, forward speed 1.2 ~ 1.5m per minute is appropriate. Where acts of injustice, should be supplemented by artificial digging fill level. Butian smaller mixing things when it is appropriate, but are prohibited from using pure mortar filled.
       Finally, seamless roll bar further tumbling surface, the surface further enhance the pulp and mix thoroughly dry tone.
       Make a request in
       A plaster on the concrete surface is strictly prohibited sprinkle sprinkler or cement.
       2 No vacuum suction process, the wiping surface is generally carried out twice. The first time in leveling forthwith. Get rid of bleeding and pressure pebbles. Second hand side must be concrete bleed water has basically ended, but the surface is still in the initial setting state when wet.
       3 compacting concrete slab surface should be smooth, with 3m straightedge check flatness.
       4 smooth nap after the transverse direction or embossing roll groove Crimp groove, so that the concrete pavement with rough textured surface. GBJ97-87 provides  highways and urban roads, factories, mines and roads nap and pressure trough depth should be 1 ~ 2mm.
       5 When the wind and sun exposure or drought, the surface should be done under the awning.
       6 Concrete Pavement Maintenance Requirements
       A concrete pavement 12 hours immediately after pouring water conservation. Curing time of 20 to 25 days, closed to traffic during the curing period.
       Two water water conservation clay building warehouse available. Warehouse building height and sub-positions should be sized to ensure that all roads are soaked in water principle.
       3 timed continued conservation of water should be added, and its duration shall be subject to weather conditions.
       4 building should pay attention to protect the pavement and curbs, to prevent damage to the concrete pavement.

Monday, July 15, 2013

artificial lawn Discussion


artificial lawn Discussion

Rapid economic development in the 21st century, with the needs of the market to fill the emergence of artificial lawn natural grass many flaws and shortcomings. To the sports industry has brought great influence and change.

I contacted the nearest golf course turf for two years to make some impression Talking practices.

Unlike natural grass artificial lawn The main difference is that the artificial lawn own advantage makes the construction and maintenance easier. Natural grass construction cost of manpower, material resources, costs are much higher than the construction of artificial lawn. artificial lawn construction is simple, concrete steps: First test underlined the artificial lawn expand and make the processing margins and trim, with particular attention should neatly trimmed turf converge in place, can not overlap the seams to heal, most edge of the wire and wire grass grass not too far away, at most, a spacing distance of the turf. Side seam bonding glue to be painted in uniform, going to be the glue to dry to solidify when turfed. And impose appropriate pressure seams for full adhesion. Adhesion to wait until the site boundary turf natural shrinkage after a long day with a knife draw a line along the boundaries of digital bits cut out, and the line width of the white turf cut into long strips of adhesive sticking to the cutting out of the boundary located compacted. Turf pavement is almost complete. The final step is filling the stadium quartz sand and plastic particles, the first layer of quartz sand evenly spreading ballast wire grass to play the role of natural erection, and then spreading ballast plastic particles. Note quartz sand can not be too large, otherwise the use of time is too long will cause the wire grass sanded off affecting life.

Wednesday, July 10, 2013

synthetic grass field applications suitable for you?


synthetic grass field applications suitable for you?

In addition to the use of indoor plants scene decoration flowers and plants placed outside briefly, linking species rich, unique shape bionic plant use, and on-site space perfect connectivity, construction of the perfect, amazing views.

synthetic grass landscaping lot of benefits:

A bionic vision plants from sunlight, air, water and other natural weather premise constraints can be based on site requirements Xpress selection of plant varieties, either barren desert northwest desert still can build a green world seasons like spring;

Second, without watering, fertilizing, do not worry about dry withered plants for the future governance save a lot of costs;

Three, followed by rapid skills to carry out the construction of information, design thinking and ideas to an unprecedented liberation, more and more present in our enormous interior space of career, synthetic grass landscaping the garden scene results excellent introduction Indoor palm plants, just cater to the needs of such space landscaping, construction of the plant can not complete the scene popular results. The so-called \ "low-carbon life \" refers to the daily life in the rest of minimizing the energy consumption, touches every aspect of our career. Our simulation tree produced from natural raw materials much more expensive than living plants, living plants not only on the original damage is not formed and trimmed increasingly promote plant development, mining down through the branches of our extraordinary technology manufacturing into various lifelike , a mix of spectacle cases and maintenance of plants not only beautify the vegetation, the maximum limit to reduce carbon consumption, let us join hands together to build a low-carbon green career tide together to safeguard our homes to make I should dedicate it.