The plastic runway construction time is how long?

The plastic runway construction steps:

1, paving underside;

2, paving the surface gum at the same time spray particles;

3, spray surface layer of plastic (to protect the particles to prevent shedding);

4 actinomycetes. 400 m standard runway, the total construction time of 25 sunny.

Construction area, at 400 m runway, generally 25 working days;

Base flatness, poor foundation flatness, and a direct impact on the plastic surface of the difficulty of construction, test the water fill level increase in the number of construction time;

Project funds, the money is not paid on time, directly affect the progress of the project, delaying the construction period.

The venue, the IAAF regulations, not spray paint to spray the micelle surface cause the plastic surface layer more hard impact Athletes effect, easy to scratch the skin by the fall. Particle, draw a line should be directly sown. 70 m2 small playground construction process is the same as the basic treatment two days, the day the end of plastic, water fill level two days, the surface glue crossed two days, three days, completed cleaning up litter and self-test dismantling two days, a total of 12 days, according to outdoor temperature of 20 degrees, lower than the 10-15 degree temperatures will increase the construction time. general maintenance two weeks after the completion of the synthetic turf before use.